

Project Overview
We proposed a smart, cost-effective refurbishment strategy that enabled Clumber Park Hotel & Spa to retain their existing steel sign frames rather than replacing them entirely. Our team prepared, repaired, and professionally repainted the frames to bring them back to a high-quality finish. We then supplied and installed new LED illumination, along with precision-made powder-coated aluminium and acrylic face panels to modernise the appearance and improve visibility.
This approach delivered a refreshed, contemporary signage package across the site at a significantly lower cost compared with full removal and replacement. By re-engineering the existing infrastructure and integrating new, energy-efficient components, we were able to extend the lifespan of the hotel’s signage while achieving a premium, cohesive look in line with the Muthu Group’s brand standards.
- Project Clumber Park Hotel & Spa
- Category Projects
- Clients Muthu
- Time 3 months
- Status Completed




